UITF Notes
Jump to navigation
Jump to search
MeV beam time
- Measure MeV dispersion with BPMs
- TM beam to 703 to see RF drift (full shift)
- Verify optics setup for HKDL
- Ascertain the true frequency of the aliased GMES peak. Can the 105 kHz peak be the same that was 692 Hz in the last run?
- Buncher scan at 2-cell=2.5, 7-cell=9.0, both crested
- 6.2: IHAM703.07242022_15:16:35 0.6895
- 6.1: IHAM703.07242022_15:18:24 0.5668
- 6.0: IHAM703.07242022_15:19:35 0.4742
- 5.9: IHAM703.07242022_15:20:50 0.4824
- 5.8: IHAM703.07242022_15:22:06 0.3907
- 5.7: IHAM703.07242022_15:23:14 0.3058
- 5.6: IHAM703.07242022_15:24:22 0.4229
- 5.5: IHAM703.07242022_15:25:27 0.4106
- 5.4: IHAM703.07242022_15:26:26 0.4095
- 5.3: IHAM703.07242022_15:27:33 0.4558
- 5.2: IHAM703.07242022_15:28:37 0.4519
- 5.1: IHAM703.07242022_15:29:38 0.4807
- 5.0: IHAM703.07242022_15:30:37 0.3753
- 4.9: IHAM703.07242022_15:31:40 0.5776
- 4.8: IHAM703.07242022_15:32:41 0.5999
- 4.7: IHAM703.07242022_15:33:41 0.6239
- 4.6: IHAM703.07242022_15:36:26 0.6529
- Buncher scan at 2-cell=2.65, -20 degrees, 7-cell=9.0 on crest
- 6.0: IHAM703.07242022_15:52:12 0.7322
- 5.9: IHAM703.07242022_15:53:17 0.7402
- 5.8: IHAM703.07242022_15:54:18 0.5116
- 5.7: IHAM703.07242022_15:55:19 0.4240
- 5.6: IHAM703.07242022_15:56:19 0.5280
- 5.5: IHAM703.07242022_15:57:20 0.4401
- 5.4: IHAM703.07242022_15:58:22 0.4363
- 5.3: IHAM703.07242022_15:59:22 0.4799
- 5.2: IHAM703.07242022_16:00:20 0.5588
- 5.1: IHAM703.07242022_16:01:21 0.4852
- 5.0: IHAM703.07242022_16:02:22 0.7616
- 4.9: IHAM703.07242022_16:03:21 0.5443, but long tail
keV beam time
- LVQE scan at different voltages. Expect same result.
- HVQE scan at different voltages. Expect different result.
- CST: Does thermal energy affect collection efficiency?
- High current to FC2 for 12+ hours, check if drift is gone
Beam line modifications
- Put HKDL stuff into the machine ahead of time!