Aug 16, 2022 - Group meeting

From Ciswikidb
Revision as of 12:47, 16 August 2022 by Grames (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

General

  • FY22 PR deadline is Friday
  • We'll meet next Tuesday at noon for lunch, Aziz will present
  • Phase I SBIR (LOI 8/29, Deadline 10/11) Link is here
  • HEPA install

Next couple months

Must
  • Repair 250/500 seed board, improve board swapping, build one spare chassis
  • By ready for Kicker and Compton experiments by October
  • Complete 200 kV HV chamber build at LERF, be ready to install UITF by November
  • Build and demo a YAG/HARP cross for CEBAF
Should
  • Reach next step in 500 kV insulator test
  • Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule
  • Load bulk sample to miniMott, demonstrate polarimeter functioning with any light source
  • Papers (magnetized beam, PV paper review, biased anode draft)
  • Second round of Mott measurements at UITF (forward detector, solenoid offset, remote HV PS/IHWP)
Like
  • Student projects, how are each of them going?
  • PSS kicker test at UITF by end of year, depends on SSG

Action Items

  • Riad - submit PR for Mott VME crate
  • Joe - tally bleed through results Spring 2022
  • Shukui - test 12 Mhz beam generation at UITF, Max to test w/ beam
  • Phil - build YAG/HARP on cross w/ top-hat and Shaun's longer nipple
  • Carlos - complete assembly of gun at LERF end of August
  • Marcy - test YAG resistance
  • Riad - finish PV reviews
  • Shukui - submit PR for beam profiler for UITF

Updates

  • Joe - I'll be attending PSTP 9/25-9/30 (e+ program at Jlab) and then ERL 10/2-10/5 (e- polarized high current)
  • Phil
  • Gabriel
  • Max
  • Mamun
  • Shukui
  • Carlos
  • Riad