Jan 10 2024

From Ciswikidb
Revision as of 07:50, 10 January 2024 by Chgarcia (talk | contribs)
Jump to navigation Jump to search

Updates from last meeting action items

  • Gabriel:
  • Alicia:
  • Max:
  • Carlos:
    • The new electrode front end can be fabricated by thee machine shop in 3 days
    • The machine shop can also do the polishing, it will take ~ 1 week.
    • Final polishing with diamond paste still needs to be done by CIS. Carlos needs to re-learn how to do this, and train others.
    • Matt gave Carlos several pieces of high quality 316L SS (crossed-forged, vacuum arc re-melt)

Items for discussion

  • Table of parameters?

Action items for next meeting

  1. Carlos still needs to make the schedule ending with beam hand-off to ops. Carlos needs input from Injector group for this.

Return to 200 kV Gun page