MOLLER PQB Meeting February 28, 2024

From Ciswikidb
Revision as of 14:55, 28 February 2024 by Bruker (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in April:

  1. FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also measure monitor resolution (new bpms, bcms).
  2. K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.

2- Today's beam study

  1. IA scans at different helicity generator settings to verify 240 Hz modes work as expected.
  2. https://logbooks.jlab.org/entry/4258233
  3. https://logbooks.jlab.org/entry/4258232