MOLLER PQB Meeting March 6, 2024
Jump to navigation
Jump to search
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
1- Two major MOLLER beam studies in April:
- FFB in Hall A: we want to start Hall A April run with FFB ON. Then, we will need 1-shift of beam studies to the hall at helicity flip of 2 kHz. We will also measure monitor resolution (new bpms, bcms).
- K-Long beam loading: we want 1-shift of beam studies with K-Long beam (5 uA low-rep rate) to Hall C and 40 uA to Hall A.
2- Results of these two tests:
- IA scans at different helicity generator settings to verify 240 Hz modes work as expected.
- https://logbooks.jlab.org/entry/4258233
- https://logbooks.jlab.org/entry/4258232