  • Fabrication
    • One additional sample electrode 30-60 was received from the shop. This sample was finished up in the shop with 600 grit sandpaper.
    • Jessica is polishing the sample piece mentioned above plus another sample received earlier. The goal is to have these pieces polished with corncob by the end of the week.
    • Machine shop expect to have the four final electrode pieces done by ~ April 10. (Two option A 16-30 deg pieces, and two of the 16-60 deg option B pieces, all made with vacuum arc re-melt 316 L SS).
    • A 24" long Teflon rod for puck manipulation during gun assembly is being made by the shop, expected to be done by ~ April 5.
  • S&A R30-3 gun in LERF clean room
    • Last week the gun was surveyed and a laser launch was established collinear with the gun z-axis.
    • Preliminary checks of laser retro-reflection were made with a mirror puck
    • Work was interrupted by the CEBAF event

Schedule

R30-4 200 kV SharePoint site


Resources needed

  • Labor
    • S&A
    • Installation