MOLLER PQB Meeting September 18, 2024

From Ciswikidb
Revision as of 16:24, 17 September 2024 by Suleiman (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Upgrade Progress:
  1. Beam tests showed excellent beam quality and good transmission at 100 μA: ELOG #4315868
  2. RTP new HV Driver full system is finally ready:
    1. Burn-in at 30 Hz started on Monday
    2. Installation Schedule: media:RTP_Installation_Schedule.pdf