February 11, 2015 - CIS Group Meeting

From Ciswikidb
Revision as of 11:57, 11 February 2015 by Grames (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

CEBAF Startup

Laser Program

A = 50uA @ 125 MHz or 100uA @ 250 MHz
B = 499
C = 250

Laser setup

No spare amps, 4-6 weeks from IPG for two replacement amps
Replace 2m (FWHM~1mm) spot lens with 1.5m (FWHM~0.4mm) lens

Phase flip

Make divider box less sensitive to EMI?
Phase monitoring to keep phases between 3 lasers
Analog gain switching at 250 MHz

Change the laser phase

When we change the frequency use 0I04 viewer to check/set phase
Command line EPICS control sufficient now, Mike Johnson still working it
Tomas can provide a ~2ns delay cable
John can DAC control a phase delay ~2ns

To Do

We will learn at separators if we can flip A/D or D/A order
We will decide by summer time a final system configuration

GTS

SF6 tanks

Bubba repaired SF6 leak, pumping now and check
Test various insulators
black = bulk resistivity = shorty R28 (ordered R30, but too little resistivity so too much current draw)
white = coated with black = suffer similar resistively too low, but at least constant
white + spiral = coated with black but sand-blasted spiral (16 feet path length, so longer length of resistor)
tracking on R350 ceramic in SF6 tank possibly due to low SF6 pressure

Electrode

Nb = pressed, polished?
Steel = welded, looks good, not polished
Wave anode, but not the spider support

Va beamline

Shop making end plates
Ordering new shell + using previous 848 turn coil
Yan figure out what fields are needed for the solenoids

UITF

Layout

Joe Gubeli generated mechanical model from preliminary Elegant layout, will study mechanical strength
HDIce group working on monte carlo model of backgrounds by dump
Meeting will be setup to advance layout of gun + prep chamber