UITC Meeting - August 12, 2015

From Ciswikidb
Revision as of 07:57, 12 August 2015 by Grames (talk | contribs)
Jump to navigation Jump to search
  • Double checking dimensions
    • Beam line height Cave 1 :
    • Beam line height Cave 2:
    • QCM downstream valve from gun/keV beam line intersection : 9.3835m
    • Distance from QCM downstream valve to HDIce upstream valve :