UITC Meeting - August 12, 2015

From Ciswikidb
Revision as of 08:06, 12 August 2015 by Grames (talk | contribs)
Jump to navigation Jump to search
  • Double checking dimensions
    • Beam line height Cave 1 : 42.0" = 1.0668m
    • Beam line height Cave 2 : 87.0" = 2.2098m
    • QCM downstream valve from gun/keV beam line intersection : 9.3835m
    • (Preliminary) Distance from QCM downstream valve to HDIce upstream valve : 10.6m