GTS meeting 9 15 15

From Ciswikidb
Revision as of 08:24, 16 September 2015 by Chgarcia (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Some pictures of the load-lock chamber installation are in the powerpoint file below.

Media:GTS_sheep_chamber_installation 9-15-15.pptx