Run2 - October 2015
Jump to navigation
Jump to search
Mott Run 2 is scheduled from October 23 - 26.
Mott Run 2 Journal - Our online summary of the experiment with many useful links
Run II Priorities ?
- Good knowledge of beam (energy, energy spread, emittance)
- Target thickness extrapolation at KE=5.0 MeV
- Sensitivity of analyzing power vs. energy about 5.0 MeV
- Repeat spot size and possibly energy spread systematic at KE=5.0 MeV
- Asymmetry vs. beam intensity
Prep and HCO w/o beam
- (John) 31 MHz laser -
- (Riad) Test laser RF trigger at DAQ
- (Joe) Make a photocathode – SL5247-4 (52471-1 was used for Run I, but it's being removed from Gun2 next week)
- (Marcy) Check Mott vacuum, configuration (hipot 3D01 again?)
- (Joe) Cycle target ladder, test camera, test magnets, test 2D harp
- (Riad/Daniel) Check HV, check DAQ, Analysis, Macros ready for 31 MHz
Pre-Run II Beam Setup and Tests
- (Injector Group) Recovery to FC2 @ 6.3 MeV by 10/15
- (1 shift) Mott beam test - Test 31 MHz synchronization, set L/R/U/D delays, set PMT HV, check PMT response
- (1 shift) Beam diagnostics - Test harp, BCM calibration, quick emittance method
Run II Beam and Polarimeter Setup
- Set KE=5.0 MeV
- Measure emittance at MQJ0L02
- Measure energy spread at IHA2D00
- Verify BCM calibration good
- Calibrate PITA IHWP=in/out
- Setup beam to Mott, check PMT HV, TOF spectra, set thresholds HI, check instrumental asymmetry
- Setup spin direction, use Mott for final adjustment
Target Foil Extrapolation at KE=5.0 MeV
- Measure foils with large aperture
- Interleave 1um gold foils to demonstrate stabiilty
Mott Run 2 Motivation Discussion
- Tim's comments following Aug 12 meeting: media:150813_Gay.docx
- Charlie's comments following Aug 12 meeting: media:150812_Sinclair.docx