Mott Run 2 Journal
Jump to navigation
Jump to search
Friday, October 23 DAY (Matt, Joe)
Friday, October 23 SWING (Tim, Marcy)
Saturday, October 24 OWL (Daniel, Riad)
Beam was restored after bypass SL klystron. Clean launch set to Mott, veto timing adjusted (DAQ or RF trigger drift?), PITA adjustments made (orbit/transmission change since last calibration?), vertical polarization set and total rate vs. thickness measured. Detailed shift summary here.