Talk:GTS meeting 1 12 16

From Ciswikidb
Revision as of 14:54, 12 January 2016 by Chgarcia (talk | contribs) (Created page with "* Phil gave an update on the item list for the multi-alkali chamber: ** He has marked the position of the gun table ** Instead of deisgning a support for th epuck fork and mak...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Phil gave an update on the item list for the multi-alkali chamber:
    • He has marked the position of the gun table
    • Instead of deisgning a support for th epuck fork and making new pucks with grooves, we will go with standard pucks and use the standrad "puck holder" attached to the rotary
    • We asked John to design/build a motor stage for the bottom manipulator
  • Magnetized beam:
    • The power supply for the big solenoid will be placed where the FEL THz chicane PS is, where there is power and water. The output will be wired up from the FEL vault to the GTS.
    • Riad mentions that the PS will likely be from ARC 6...