GTS meeting 5 31 16
Jump to navigation
Jump to search
- We ran beam for RadCon Surveys
- 300keV DC beam 1.6 uA on the Dump
- The laser variable attenuator is not working, so we started to steer beam through the viewers, but seems the beam is too intense.
- Yan steered the beam to the dump, which reportes 1.6 micro-Amps! This made the vacuum increase from 1E-11 Amps, to about 1E-6 Amps when the beam was at each viewer.
- Shukui has a plan to have full control of the laser output power and variable attenuator. It involves setting up a PC in the GTS, and a new ThorLabs variable attenuator wheel.
- William Lu is working on getting the beam dump Kethley signal to EPICS
- First we ran at 275kV, then at 300kV, stable!
- See this link for the Log entry
- Oh! The electricians wired up a GTS enclosure light switch! it works!
- What do we do next!
- Yan points out that emittance measurements will be very difficult, if not impossible, because the solenoid is not counter wound.
- Want a camera on top viewport to look at laser spot on the cathode
- Align beam on solenoids, perhaps need to physical adjust the first solenoid mount.
- Need to write a beam measurements and cathode lifetime studies plan.
- Before going to higher beam current, Need to short out the conditioning resistor.
- At 1 micro-Amps beam current, the voltage drop on the cathode is already 0.3 kV, at 100 micro-Amps it will be 30 kV!!! because the resistor is 300 Mega-Ohms.
- We should let Shukui take the time to give us full control of the laser power and attenuator.
- What else?....