Talk:GTS meeting 6 27 16
Jump to navigation
Jump to search
- Things to try next, in order:
1. Run with the beam viewers shields completely out for improved pumping speed, 2. Bias anode positive, John hsa PS 3. Increase laser spot size to 4 mm 4. Make a brand new photocathode (there is one puck with bare GaAs in the prep chamber) using the mask.