Talk:GTS meeting 6 27 16

From Ciswikidb
Revision as of 10:37, 27 June 2016 by Chgarcia (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Things to try next, in order:
  • 1. Run with the beam viewers shields completely out for improved pumping speed,
  • 2. Bias anode positive, John hsa PS
  • 3. Increase laser spot size to 4 mm
  • 4. Make a brand new photocathode (there is one puck with bare GaAs in the prep chamber) using the mask.
  • For future, Joe G. recommends to do a high temp (450) beam dump bakeout.
  • And also:
    • QE scanner, Dennis Turner working on software, Shukui and Adriana to setup laser scanner beam alignment
    • We need full EPICS control of the laser....some day