GTS meeting 6 20 16
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
- 1 mA to the dump! at 275 kV
- The QE was estimated to be around 0.3%
- We discovered that the Haimson coil corrector was not steering the beam properly. Later on Joe Grames and Yan Wang discovered it was wired up as a quad. They corrected the problem.
- Beam on Viewers
- Adriana and Shukui did a calibration of the laser power meter located inside the hutch and read in the control room with respect to the laser power going into the gun vacuum chamber.
- Did the cathode got damaged here?
- Image of cathode damage
- Laser and electron beam after discovering bad laser shape
- Adriana discovered that the bad laser shape is due to a damaged polarizer in the hutch. Shukui gave permission to fix the problem.
- The graph below shows the QE curves for various runs, indicating QE drop with running time.
- Mamun and Chio have made a 12% multi-alkali in Nb substrate