*The gun fully assembled is being vacuum pre-baked to ~150 C  in TL1137 to ensure there are no leaks, and that the NEG models are not shorted out. Marcy installed a, extractor gauge for vacuum monitoring after bake.  
 
*The gun fully assembled is being vacuum pre-baked to ~150 C  in TL1137 to ensure there are no leaks, and that the NEG models are not shorted out. Marcy installed a, extractor gauge for vacuum monitoring after bake.  
 
*The plan is to leave the gun under vacuum until ready for installation in UITF beam line, with plans to install in CEBAF tunnel in March 2023.
 
*The plan is to leave the gun under vacuum until ready for installation in UITF beam line, with plans to install in CEBAF tunnel in March 2023.
 +
 +
 +