Difference between revisions of "200 kV Gun - Jan 26, 2022"
Jump to navigation
Jump to search
(Created page with "At today's meeting we decided on following ME tasks, # ground screen - open wire mesh w/ frame + connectors to tabs # anode design - flat & tilted grounded tube + slots for...") |
(No difference)
|
Revision as of 23:08, 26 January 2022
At today's meeting we decided on following ME tasks,
- ground screen - open wire mesh w/ frame + connectors to tabs
- anode design - flat & tilted grounded tube + slots for increased conductance
- model field - symmetric model fields for electrostatic solution
- assembly dwg - complete set of drawings and parts
- layouts - CEBAF integrated with Phase 1 beam line + UITF modifications to test temporarily