At today's meeting we decided on following ME tasks,
+
At today's meeting we heard about the following:
  
 +
==Tally of ME jobs==
 
# ground screen - open wire mesh w/ frame + connectors to tabs
 
# ground screen - open wire mesh w/ frame + connectors to tabs
 
# anode design - flat & tilted grounded tube + slots for increased conductance
 
# anode design - flat & tilted grounded tube + slots for increased conductance
Line 6: Line 7:
 
# assembly dwg - complete set of drawings and parts
 
# assembly dwg - complete set of drawings and parts
 
# layouts - CEBAF integrated with Phase 1 beam line + UITF modifications to test temporarily
 
# layouts - CEBAF integrated with Phase 1 beam line + UITF modifications to test temporarily
 +
 +
==Cathode==
 +
* Ceramic welded to vacuum fired flange ready, verify if leak checked
 +
* Weld spare ceramic to vacuum fired flange, leak check
 +
* Cathode ball and Pierce electrode ready, polished
 +
* Cathode "butt" in hand, needs to be polished
 +
* Cathode puck holder parts mainly in hand, need sapphire roller hardware (instead of welding wire)
 +
* Carlos will tally plan for polishing, cleaning, fit-up, assembly, and fiducials

Revision as of 23:14, 26 January 2022

At today's meeting we heard about the following:

Tally of ME jobs

  1. ground screen - open wire mesh w/ frame + connectors to tabs
  2. anode design - flat & tilted grounded tube + slots for increased conductance
  3. model field - symmetric model fields for electrostatic solution
  4. assembly dwg - complete set of drawings and parts
  5. layouts - CEBAF integrated with Phase 1 beam line + UITF modifications to test temporarily

Cathode

  • Ceramic welded to vacuum fired flange ready, verify if leak checked
  • Weld spare ceramic to vacuum fired flange, leak check
  • Cathode ball and Pierce electrode ready, polished
  • Cathode "butt" in hand, needs to be polished
  • Cathode puck holder parts mainly in hand, need sapphire roller hardware (instead of welding wire)
  • Carlos will tally plan for polishing, cleaning, fit-up, assembly, and fiducials