200 kV Gun - Jan 26, 2022

From Ciswikidb
Revision as of 23:08, 26 January 2022 by Grames (talk | contribs) (Created page with "At today's meeting we decided on following ME tasks, # ground screen - open wire mesh w/ frame + connectors to tabs # anode design - flat & tilted grounded tube + slots for...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

At today's meeting we decided on following ME tasks,

  1. ground screen - open wire mesh w/ frame + connectors to tabs
  2. anode design - flat & tilted grounded tube + slots for increased conductance
  3. model field - symmetric model fields for electrostatic solution
  4. assembly dwg - complete set of drawings and parts
  5. layouts - CEBAF integrated with Phase 1 beam line + UITF modifications to test temporarily