200 kV gun
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
- High voltage test => evaluate onset of field emission in small HV chamber with tee electrode
- Install high voltage insulator or PIG
- Plan media:200817_Tee_Evaluation.pptx
- Gun work => replace cathode in small HV chamber with small shed and tee electrode
- Install and align new small shed (cut from large shed) SS tee w/ conductive insulator
- Replace 10" anode flange (no change to anode spider - tube - anode) with tapped flange for BPM
- Remove inline getters
- Build new 2I beam line (BPM-tube-BPM-tube/FX-bellows-BPM-valve)
- Bake
- High voltage test => evaluate on set of field emission, high voltage gas condition to 200 kV no FE
- The spreadsheet below contains procedures for the gun high voltage jobs described above and also for Wien filter HV evaluation
Media:High Voltage Work Gun2 & Wien filters.xlsx
- Gun work place holder => replace with large HV chamber, large tee w/ shed and off set biased anode