Difference between revisions of "2021-01-14"

From Ciswikidb
Jump to navigation Jump to search
Line 18: Line 18:
 
# First commissioning of water irradiation beamline in May??? (goal)
 
# First commissioning of water irradiation beamline in May??? (goal)
  
==== <u>Engineering Tasks</u> ====
+
==== <u>Engineering:</u> ====
'''EES-RF:''' Troubleshooting Booster behavior
+
''EES-RF:'' Troubleshooting Booster behavior
  
'''EES-DC:''' QD/QJ quads okay by Meyers for no water cooling up to 10A (revisit if fields higher than that are required)
+
''EES-DC:'' QD/QJ quads okay by Meyers for no water cooling up to 10A (revisit if fields higher than that are required)
  
'''SSG:''' Known MPS nodes to add:
+
''SSG:'' Known MPS nodes to add:
 
#* Fast valve
 
#* Fast valve
 
#* Solenoid current window comparator (perhaps needed?, worst case: small window temp rise)  
 
#* Solenoid current window comparator (perhaps needed?, worst case: small window temp rise)  
 
#* BCM over current trip set point.  MPS/PSS BCM similar to CEBAF injector; find receiver and determine implementation at UITF
 
#* BCM over current trip set point.  MPS/PSS BCM similar to CEBAF injector; find receiver and determine implementation at UITF
  
'''EES-IC:''' [[media: I&C tasks ver1.docx]]
+
''EES-IC:'' [[media: I&C tasks ver1.docx]]
  
 
#*Action item: List all the tasks we have for Engineering: I&C, DC power, SSG and provide as much notice as possible. [McCaughan]
 
#*Action item: List all the tasks we have for Engineering: I&C, DC power, SSG and provide as much notice as possible. [McCaughan]

Revision as of 14:02, 13 January 2021

Meeting Information

The meeting will be on Thursday January 14, 2020 at 2:00 PM EDT.

Connecting

To connect to the meeting, please do the following:

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc.
  2. CMTF tests with C75-1 (~mid-Mar- mid-Apr). Gigi: CMTF schedule / testing duration
  3. UITF beamline Modification in parallel to install new beamline
  4. First commissioning of water irradiation beamline in May??? (goal)

Engineering:

EES-RF: Troubleshooting Booster behavior

EES-DC: QD/QJ quads okay by Meyers for no water cooling up to 10A (revisit if fields higher than that are required)

SSG: Known MPS nodes to add:

    • Fast valve
    • Solenoid current window comparator (perhaps needed?, worst case: small window temp rise)
    • BCM over current trip set point. MPS/PSS BCM similar to CEBAF injector; find receiver and determine implementation at UITF

EES-IC: media: I&C tasks ver1.docx

    • Action item: List all the tasks we have for Engineering: I&C, DC power, SSG and provide as much notice as possible. [McCaughan]


Back to Main Meeting Minutes Page