Difference between revisions of "2021-01-26"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "== Meeting Information == The meeting will be on Thursday January 14, 2020 at 2:00 PM EDT. ==== Connecting ==== To connect to the meeting, please do the following: # To join...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
== Meeting Information ==
+
== Meeting Information ==The meeting will be on Thursday January 27, 2020 at 9:00 AM EST.
The meeting will be on Thursday January 14, 2020 at 2:00 PM EDT.
 
  
 
==== Connecting ====
 
==== Connecting ====
Line 14: Line 13:
 
Rough timetable:
 
Rough timetable:
 
# Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc. (Jan./Feb.)
 
# Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc. (Jan./Feb.)
 +
# ERR ~ Mid-Feb.
 
# HDIce run2b (March 1-7)
 
# HDIce run2b (March 1-7)
 
# CMTF tests with C75-1 (mid-March - mid-April).  Gigi: CMTF schedule / testing duration
 
# CMTF tests with C75-1 (mid-March - mid-April).  Gigi: CMTF schedule / testing duration

Latest revision as of 01:06, 10 February 2021

== Meeting Information ==The meeting will be on Thursday January 27, 2020 at 9:00 AM EST.

Connecting

To connect to the meeting, please do the following:

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc. (Jan./Feb.)
  2. ERR ~ Mid-Feb.
  3. HDIce run2b (March 1-7)
  4. CMTF tests with C75-1 (mid-March - mid-April). Gigi: CMTF schedule / testing duration
  5. UITF beamline Modification in parallel to install new beamline
  6. First commissioning of water irradiation beamline in May??? (goal)

New items for discussion:

  • HDIce run2b discussion and impacts (Matt)
Tentative:
  • Rooftop removal Feb. 26/Install Mar. 1
  • Beam ~1 week
  • Engineering group changes and coordination / defer to HDIce
  • ERR Agenda & Assignments (Mike)
  • Solenoid Status & Installation (Gigi)


Reports on Open Action Items:

Back to Main Meeting Minutes Page