Difference between revisions of "2021-04-28"

From Ciswikidb
Jump to navigation Jump to search
Line 36: Line 36:
 
*#*Shaun iterating on design to add additional viewer per Yan/Matt's request
 
*#*Shaun iterating on design to add additional viewer per Yan/Matt's request
 
*#*Pull Heliax from Sprectrum analyzer/Control room >> Buncher
 
*#*Pull Heliax from Sprectrum analyzer/Control room >> Buncher
*#*Ready to install Al base plates for FC3 region rework as well as solenoid stand
+
*#*Ready to install Al base plates for FC3 region rework as well as solenoid stand. Solenoid plate with magnet; FC3 plate awaiting machining - need still a few weeks off.
 
*#*Inventory Faye's old office for materials
 
*#*Inventory Faye's old office for materials
 
*#*Vacuum work / Beam line assembly Fridays starting at 9am for any who want to participate
 
*#*Vacuum work / Beam line assembly Fridays starting at 9am for any who want to participate
Line 47: Line 47:
 
*#*Do we have fluorescing screen on hand for behind samples?
 
*#*Do we have fluorescing screen on hand for behind samples?
 
*#*Parts for install; give them to Teena for UHV cleaning...
 
*#*Parts for install; give them to Teena for UHV cleaning...
 +
*#*Viewer screens require alignment
 +
*#*Steal BPMs from elevated line
 +
*#*Add table for vacuum work staging
 +
*#*Screen Material / intensifier on hand; have holder.
 +
*#*Finish pilageing elevated line; get Shaun list of required transitions.
 
* Engineering
 
* Engineering
 
* Other business
 
* Other business

Revision as of 09:11, 29 April 2021

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. CMTF tests with C75-1 (late-March - early-June).
  2. UITF beam line modification
  3. Supplementary Shielding Installation: Mid-June
  4. Beamline Commissioning / Test Plans / Shielding Verification
  5. 7/26/21 Start Hot Check-out
  6. Commission new beam line and execute experiment

Long Term Schedule (McCaughan) Strawman

New items for discussion:

  • Beam Studies updates
  • Short term schedule update:
    1. This week:
      • Component disconnects (Mostly complete)
      • Stage larger table for beamline prep behind MeV dump (Complete)
      • Vent elevated line for component removal (Complete)
      • Pull components from elevated line (In progress) IDLM601 dump, FC4, ITVM905, and VIPM904,5a,and 5b removed. ITVM904 in progress.
      • Diagnose Chopper slit (Complete - gear box issue; on A5 controls/STAC5 now. Thanks to Scott!)
      • Build 80/20 support structure; add mounting plates/brackets/etc. (Complete under solenoid; Pb table still needs construction)
      • Gun work (Alignment work in progress...)
      • Target interlock completed for beam mode with SCAM (Thanks to all involved!)
      • Shaun iterating on design to add additional viewer per Yan/Matt's request
      • Pull Heliax from Sprectrum analyzer/Control room >> Buncher
      • Ready to install Al base plates for FC3 region rework as well as solenoid stand. Solenoid plate with magnet; FC3 plate awaiting machining - need still a few weeks off.
      • Inventory Faye's old office for materials
      • Vacuum work / Beam line assembly Fridays starting at 9am for any who want to participate
    2. Next Week:
      • Unistrut mounting for cables / gas bottle rack
      • Post 2-d schematic on beam line to guide installation
      • Install the brackets and flange supports on 80/20
      • PEPPo magnet/Solenoid progress?
      • Gasket purchase: Dunniway Stock Room or Kurt Lesker (silver plated, 2.75", 4.5" and 4 5/8", 30 ea. plus blank 2.75" for the conductance limiting aperture, pack of 10) - Copy from Matt/Marcy's req queue.
      • Do we have fluorescing screen on hand for behind samples?
      • Parts for install; give them to Teena for UHV cleaning...
      • Viewer screens require alignment
      • Steal BPMs from elevated line
      • Add table for vacuum work staging
      • Screen Material / intensifier on hand; have holder.
      • Finish pilageing elevated line; get Shaun list of required transitions.
  • Engineering
  • Other business

Reports on Open Action Items:

  • Action Items:
    1. Formal run plan

Back to Main Meeting Minutes Page