2021-04-28

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. CMTF tests with C75-1 (late-March - early-June).
  2. UITF beam line modification
  3. Supplementary Shielding Installation: Mid-June
  4. Beamline Commissioning / Test Plans / Shielding Verification
  5. 7/26/21 Start Hot Check-out
  6. Commission new beam line and execute experiment

Long Term Schedule (McCaughan) Strawman

New items for discussion:

  • Beam Studies updates
  • Short term schedule update:
    1. This week:
      • Component disconnects (Mostly complete)
      • Stage larger table for beamline prep behind MeV dump (Complete)
      • Vent elevated line for component removal (Complete)
      • Pull components from elevated line (In progress) IDLM601 dump, FC4, ITVM905, and VIPM904,5a,and 5b removed. ITVM904 in progress.
      • Diagnose Chopper slit (Complete - gear box issue; on A5 controls/STAC5 now. Thanks to Scott!)
      • Build 80/20 support structure; add mounting plates/brackets/etc. (Complete under solenoid; Pb table still needs construction)
      • Gun work (Alignment work in progress...)
      • Target interlock completed for beam mode with SCAM (Thanks to all involved!)
      • Shaun iterating on design to add additional viewer per Yan/Matt's request
      • Pull Heliax from Sprectrum analyzer/Control room >> Buncher
      • Ready to install Al base plates for FC3 region rework as well as solenoid stand. Solenoid plate with magnet; FC3 plate awaiting machining - need still a few weeks off.
      • Inventory Faye's old office for materials
      • Vacuum work / Beam line assembly Fridays starting at 9am for any who want to participate
    2. Next Week:
      • Unistrut mounting for cables / gas bottle rack
      • Post 2-d schematic on beam line to guide installation
      • Install the brackets and flange supports on 80/20
      • PEPPo magnet/Solenoid progress?
      • Gasket purchase: Dunniway Stock Room or Kurt Lesker (silver plated, 2.75", 4.5" and 4 5/8", 30 ea. plus blank 2.75" for the conductance limiting aperture, pack of 10) - Copy from Matt/Marcy's req queue.
      • Do we have fluorescing screen on hand for behind samples?
      • Parts for install; give them to Teena for UHV cleaning...
      • Viewer screens require alignment
      • Steal BPMs from elevated line
      • Add table for vacuum work staging
      • Screen Material / intensifier on hand; have holder.
      • Finish pilageing elevated line; get Shaun list of required transitions.
  • Engineering
  • Other business

Reports on Open Action Items:

  • Action Items:
    1. Formal run plan

Back to Main Meeting Minutes Page