2021-05-12

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Rough timetable:

  1. CMTF tests with C75-1 (late-March - early-June).
  2. UITF beam line modification
  3. Supplementary Shielding Installation: Mid-June
  4. Beamline Commissioning / Test Plans / Shielding Verification
  5. 7/26/21 Start Hot Check-out
  6. Commission new beam line and execute experiment

Long Term Schedule (McCaughan) Strawman

New items for discussion:

Short term schedule update:
This week:

  • Component disconnects (Mostly complete)
  • Diagnose Chopper slit (Complete - gear box issue; on A5 controls/STAC5 now. Thanks to Scott!)
  • Post 2-d schematic on beam line to guide installation (Completed and posted)
  • Install more brackets and flange supports on 80/20 (BPM locations; need measurements...) (Completed)
  • PEPPo magnet/Solenoid installed on 80/20 (Completed)
  • Gun work progressing well:
    1. Schneedle replaced
    2. Scheedle, anode, and cathode aligned
    3. Gun rebuild schedule
  • Vacuum work / Beam line assembly Fridays starting at 10:30 am for any who want to participate

Next Week:

  • Alignment today (Wed.) or Friday of big pieces (solenoid, viewer crosses, FC4)
  • Get area up to transition after solenoid under vacuum. Install valve/bellow/bpm.
  • Install 4 5/8" BPMs after insertion measurements completed
  • Break vacuum in FC3 region

2 weeks:

  • Build 80/20 support structure; add mounting plates/brackets/etc. (Pb table components awaiting delivery)
  • Pull Heliax from Sprectrum analyzer/Control room >> Buncher
  • Unistrut mounting for cables / gas bottle rack - Neal will do when available
  • 4th terminal system in Control room under assembly/rebuild
  • Ready to install Al base plates for FC3 region rework as well as solenoid stand. FC3 plate awaiting machining.
  • Items from To-do list...

Engineering

  • Insertion measurements in progress on 4 5/8" BPMs

Other business

Reports on Open Action Items:

Action Items:

  • Formal run plan (McCaughan)