2021-06-09

From Ciswikidb
Revision as of 14:20, 1 June 2021 by Michaelm (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Long Term Schedule: Gantt (Outstanding tasks)

  1. Supplementary Shielding Installation: Mid-June
  2. Beamline Commissioning / Test Plans / Shielding Verification
  3. 7/26/21 Start Hot Check-out
  4. Commission new beam line and execute experiment
  5. Science!!!

New items for discussion:

Short term schedule update:
This week:

  • Elevated beam line terminated in pump and RGA leak checked
  • Experimental beam line under vacuum, RGA leak check required (Forecast)
  • Vacuum pumping down well, but light bake may be required once we have completed installation.

Still to do:

  • Install target mechanism
  • Add Mu metal over bellows on wastewater line.
  • Gun work progressing well:
    1. HV chamber evaluation - plan to bake to evaporate lubricant & pump it off, install photocathode, and bake again.
    2. Sb source laser aperture added in depo chamber; aligned to laser path.
    3. Gun rebuild schedule
    4. Minor SF6 leak in HV chamber identified; repair later...


Next Week:

  • Build 80/20 support structure; Pb table components awaiting delivery.
  • Wrap up downstream vacuum work
  • EES may start cabling downstream section & making UED updates.
  • Break vacuum in FC3 region
  • Ready to install Al base plates for FC3 region rework as well as solenoid stand. FC3 plate awaiting machining.

2 weeks:

  • Mount bottle rack in Labyrinth; remove gas bottles to rack.
  • Unistrut mounting for cables - Neal will do when available
  • Pull Heliax from Spectrum analyzer/Control room >> Buncher
  • 4th terminal system in Control room under assembly/rebuild
  • Items from To-do list...

Engineering Other business

Reports on Open Action Items:

Action Items:

  • Formal run plan (McCaughan)