Difference between revisions of "2021-07-21"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
 
Line 13: Line 13:
 
==== <u>Schedule</u> ====
 
==== <u>Schedule</u> ====
 
Long Term Schedule: [[Media:WW-Install_6.22.21.pdf|Gantt]] ([[Media:WW-ToDo_6.22.21.pdf|Outstanding tasks]])
 
Long Term Schedule: [[Media:WW-Install_6.22.21.pdf|Gantt]] ([[Media:WW-ToDo_6.22.21.pdf|Outstanding tasks]])
# Supplementary Shielding Installation: ???
 
# Beamline Commissioning / Test Plans / Shielding Verification
 
 
# 7/26/21 Start Hot Check-out
 
# 7/26/21 Start Hot Check-out
# Commission new beam line and execute experiment
+
 
# Science!!!
+
 
  
 
==== <u>New items for discussion:</u> ====
 
==== <u>New items for discussion:</u> ====
 
<u>Short term schedule update:</u><br>
 
<u>Short term schedule update:</u><br>
 
<u>This week:</u>  
 
<u>This week:</u>  
* [https://logbooks.jlab.org/entry/3883030 Harp and NEG installed in MeV Spectrometer Line], [logbooks.jlab.org/entry/3883225 leak checked good].
+
* [https://logbooks.jlab.org/entry/3884298 Spectrometer pumps on EPICs], [https://logbooks.jlab.org/entry/3884303 Turbo disconnected]
 
* [https://logbooks.jlab.org/entry/3883526 Corrector installation & cable reroute mostly complete], turned over to DC power
 
* [https://logbooks.jlab.org/entry/3883526 Corrector installation & cable reroute mostly complete], turned over to DC power
* [https://logbooks.jlab.org/entry/3883569 BPM cabling rerouted & RF modules installed]; turned over to IC/Software for integration
+
* [https://logbooks.jlab.org/entry/3884311 BPMs connections good - save iocipmm904 removal - iocipmm901 installed in its place]
 +
* [https://logbooks.jlab.org/entry/3885222 Nomenclature for elements disseminated and labelled]
 
* Raster installation - completed; turned over to Bill Gunning
 
* Raster installation - completed; turned over to Bill Gunning
 +
* Install target mechanism (Completed), [https://logbooks.jlab.org/entry/3884440 motor controls tested] - Survey required
 
* Build 80/20 support structure for Pb (Completed)
 
* Build 80/20 support structure for Pb (Completed)
 
* Pb stacked; some modification possibly required. RCG/ME discussing.
 
* Pb stacked; some modification possibly required. RCG/ME discussing.
* Install target mechanism (Completed) - Survey required
+
* EES work happening in earnest
* EES may start cabling downstream section & making UED updates.
 
 
* Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support]
 
* Ready to install Al base plates for FC3 region rework as well as solenoid stand. [https://logbooks.jlab.org/entry/3883262 80/20 reworked for support]
 
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]]
 
* [[media:Engineering-support-jobs.docx| List of Engineering Jobs remaining]]
  
 
Gun work progressing well:
 
Gun work progressing well:
* [https://logbooks.jlab.org/entry/3882796 HVPS SF6 leak quantified]
+
* [https://logbooks.jlab.org/entry/3884328 Gun/Depo chamber bake started] and [https://logbooks.jlab.org/entry/3885376 completed]
* [https://logbooks.jlab.org/entry/3882992 S&A report post gun electrode alignment]
+
 
 
* [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
 
* [https://wiki.jlab.org/ciswiki/index.php/Spring_2021_-_Rebuilding_Photogun Gun rebuild schedule]
  

Revision as of 11:51, 19 July 2021

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
  3. To join via phone, use one of the following numbers and the Conference ID: 946721076.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

Long Term Schedule: Gantt (Outstanding tasks)

  1. 7/26/21 Start Hot Check-out


New items for discussion:

Short term schedule update:
This week:

Gun work progressing well:

Still to do:

  • Add Mu metal over bellows on wastewater line.


Next Week:

  • Mount bottle rack in Labyrinth (Staged); remove gas bottles to rack.
  • Unistrut mounting for cables - Neal will do when available
  • Engineering work on beam line starting

2 weeks:

  • Pull Heliax from Spectrum analyzer/Control room >> Buncher
  • 4th terminal system in Control room under assembly/rebuild
  • Items from To-do list...

Engineering Other business

Reports on Open Action Items:

Action Items:

Back to Main Meeting Minutes Page