Difference between revisions of "2021-08-25"

From Ciswikidb
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 81: Line 81:
 
# Shielding package verified by RCG [Complete]
 
# Shielding package verified by RCG [Complete]
 
# Quick Reference Drawing; File transferred to Mike and updated. Final walk down needed.
 
# Quick Reference Drawing; File transferred to Mike and updated. Final walk down needed.
 +
# Archive Harp / Viewer/ BCM signals
 +
# Populate UED with IOC rack locations
  
 
[[To-do_list| General UITF tasks]]
 
[[To-do_list| General UITF tasks]]
  
 
[[Meeting_minutes | Back to Main Meeting Minutes Page]]
 
[[Meeting_minutes | Back to Main Meeting Minutes Page]]

Latest revision as of 00:07, 25 August 2021

Meeting Information

Connecting

To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/984025598.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 984025598.
  3. To join via phone, use one of the following numbers and the Conference ID: 984025598.
    • Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Agenda

Schedule

  1. 8/23/21 Start commissioning (2 weeks) [In progress]
  2. 8/23 BNNT cooldown in CMTF (Allegedly)
  3. 9/7/21 Perform experiment (3 weeks)
  4. 10/18 C50R in CMTF
  5. Booster qualification following experiment until cryo trade to CMTF

New items for discussion:

General:

Reports by Group:

Experiment:

  • Shift staffing schedule good for now; 2nd pass later. Li training as operator.

Software

CIS/EGG:

  • Photocathode with 4% QE created by Max and behaving well!

DC Power:

  • Trims: Complete - excluding M603H/V pair not appearing on trim rack
  • Solenoid UITFList Task: Interlock checks completed. Diagnostics on box supply reading incorrectly, measured input voltage at supply to be 470VAC. Diagnostic repair and powering load to be completed at first opportunity.


Instrumentation and Controls:

Vacuum (Ketchum/Kortze)

BCM

  • BCM project software integration under way between Musson/Seaton and Sue Witherspoon

SSG: BLM installation underway:

  • Replace those previously removed
  • Additions
    1. In crotch of MeV/Wastewater selecting dipole.
    2. Near 1st new diagnostic cross d.s. of solenoid
    3. Near 2nd new diagnostic cross by FC4
    4. D.S. of target after lead shielding

FSD inputs (original)

  • BCM current clamp system
  • Update gold masking

ME / Installation:

  • Songsheet being updated by Shaun; be sure to let him know when changes are made!

Action items:

  1. Open Tasks:
    • RCG Test (Keith) (Done)
    • Fast Valve Test (Leo/Jim)
    • Target Encoder Interlock (Scott/Weiwei/Gary) [Complete]
    • BLM test (Scott B.)
    • Target Rail calibration [Complete]
  2. Snap file for design optics (Dennis/Xi) [Complete; loaded]
  3. Daily Run Coordinator Meetings (Mike/Gigi) [Done; 4:30 pm daily okay?]
  4. Populate shift plans (Mike / Gigi)
  5. Shift taker instructions (Mike) [Complete]
  6. HCO [Complete - keV]
  7. Beam Authorization (Mike) [Complete]
  8. Hazard analysis for Randy (Mike)
  9. Shielding package verified by RCG [Complete]
  10. Quick Reference Drawing; File transferred to Mike and updated. Final walk down needed.
  11. Archive Harp / Viewer/ BCM signals
  12. Populate UED with IOC rack locations

General UITF tasks

Back to Main Meeting Minutes Page