AIPINJ - Layouts
Revision as of 18:15, 24 February 2021 by Moser (talk | contribs) (→Injector quick reference drawing)
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Phase 1 - Songsheet
- Feb 23, 2021 - Preliminary songsheet update media:210223_ACC0002845-0001, INJECTOR, REV C.pdf
- Correct order of MBH2I01AH/V and MBH2I01H/V, put the one with the "A" second
- Correct order of VIP0I03 and MED0I03
- Feb 18, 2021 - Preliminary songsheet update media:210218_ACC0002845-0001, INJECTOR, REV C.pdf
- VIP2I01A => VIP2I00A
- VIP2I01B => VIP2I00B
- VIP2I01C => VIP2I00C
- VIP2I01 => VIP2I00
- ILL2I01DCANO => ILL2I00DCANO
- VGP0I01 => VGP0I01A
- Feb 1, 2021 - Preliminary songsheet release media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf
Injector quick reference drawing
- Updated (2/19/21) Inj Quick Reference, Rev17beta, Draft 2 media:12GeV injector quick reference rev17 DRAFT-2.pdf
- AIPINJ Phase I updated (2/12/21) Injector Quick Reference, Rev17beta, Draft 1 media:12GeV_injector_quick_reference_rev17_DRAFT-1.pdf
- Pre-Upgrade (April 2020) injector quick reference : media:12GeV_injector_quick_reference_rev16.pdf
Phase 1 - CED Layout Info
- Jan 27, 2021 - media:210127_AIPINJ_CED_v2.xlsx Row "D" shows edit for songsheet
- Sep 14, 2020 - media:200914_AIPINJ_CED.xlsx Final, updated CED list (checked DM/JG/AH/MS)
- Sep 10, 2020 - Rev 7 media:200910_AIPINJ_layout_rev7.xlsx returns VCG1I02
- Aug 31, 2020 - Rev 6 media:200831_AIPINJ_layout_rev6.xlsx Preliminary list and component comparison
Phase 1 - Gun to Chopper Layouts
- Sep 14, 2020 media:beamlinelayoutsep10.pdf Final, updated layout (checked DM/JG/AH/MS)
- Aug 27, 2020 media:beamlinelayoutaug27.pdf Preliminary Phase 1 layout
- Aug 21, 2020 media:SONGSHEET AUGUST 21 dm comments.pdf Draft/preliminary songsheet
- Apr 15, 2020 media:beamlinelayoutapril15.pdf attached is the latest layout for the beamline components
- Apr 07, 2020 media:beamlinelayoutapril7.pdf puzzling A1/A2 layout, moving FX 2" upstream
- Mar 26, 2020 media:beamlinelayoutmarch26.pdf
- Mar 09, 2020 media:BEAMLINELAYOUTMAR09.pdf 90% complete layout; note bellows on A1/A2 girder
- Feb 26, 2020 media:BEAMLINELAYOUTFEB26.pdf edits post ME meeting, small corrections
- -sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
- -remove the pink rectangular placeholders for quadrupoles
- -sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
- -restore gap between the FG solenoids as exists in tunnel today
- -sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
- -if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
- Feb 07, 2020 media:beamlinelayoutfeb07.pdf edits post ME meeting, small corrections
- Feb 04, 2020 media:BEAMLINELAYOUTFEB04.pdf edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
- Jan 31, 2020 media:200203_layout.pdf major revision, for functionality to setup the beam line
- Jan 22, 2020 media:layout01232020.pdf move 2nd lens to accomodate 2-3/4" or 4-1/2" window
- Jan 15, 2020 media:200115_gun2chopper.pdf restore MFA0I03 and MFA0I05 to beam line
- Jul 17, 2019 media:gunthroughchopperjuly17.pdf
- Jun 13, 2019 media:190613_guntochopper.pdf
Phase 2 - Booster Layouts
Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- Sep 26, 2019 media:190926_boosterregion.pdf
- -QCM was .32" further downstream. so all those interfaces moved.
- -distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
- -buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
- -YAO cavity was .37" longer than the design drawing.
- July 17, 2019 media:chopperthroughmodulejuly17.pdf
- June 10, 2019 media:190610_layoutjune10.pdf
Overall Phase 1 & 2 AIPINJ Layouts
Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
- July 19, 2019 media:keytotaljuly19.pdf
- July 17, 2019 media:keytotaljuly17.pdf