Phase 1 - Songsheet

   Please add a date besides the word PRELIMINARY, a sort of version control until final
   Change “2I01” to “2I00” on the following 
       VIP2I01A => VIP2I00A 
       VIP2I01B => VIP2I00B 
       VIP2I01C => VIP2I00C 
       VIP2I01 => VIP2I00 
       ILL2I01DCANO => ILL2I00DCANO 
   Change VGP0I01 to VGP0I01A due to the cross it is on. 
   Would be clearer if MBH2I01H and V are listed in column after MFX2I01 
   MFA1D00 is unpowered and located between VBV1D00 and MAD1D00H.  Helpful to show (anywhere) and list as *MFA1D00* denoting unpowered 
   VIP1D00 should be on its own line between ITV1D00 and IDL1D00 

Phase 1 - CED Layout Info

Phase 1 - Gun to Chopper Layouts

-sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
-remove the pink rectangular placeholders for quadrupoles
-sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
-restore gap between the FG solenoids as exists in tunnel today
-sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
-if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown

Phase 2 - Booster Layouts

Note: At the November 12, 2019 Modeling meeting [1], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.

-QCM was .32" further downstream. so all those interfaces moved.
-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
-YAO cavity was .37" longer than the design drawing.

Overall Phase 1 & 2 AIPINJ Layouts

Note: At the November 12, 2019 Modeling meeting [2], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.

Injector quick reference drawing