− | ==Overall Layouts==
| |
− | Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
| |
− | * July 19, 2019 [[media:keytotaljuly19.pdf]]
| |
− | * July 17, 2019 [[media:keytotaljuly17.pdf]]
| |
| | | |
− | ==Gun Layouts==
| |
− | * Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections
| |
− | * Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
| |
− | * Jan 31, 2020 [[media:200203_layout.pdf]] major revision, for functionality to setup the beam line
| |
− | * Jan 22, 2020 [[media:layout01232020.pdf]] move 2nd lens to accomodate 2-3/4" or 4-1/2" window
| |
− | * Jan 15, 2020 [[media:200115_gun2chopper.pdf]] restore MFA0I03 and MFA0I05 to beam line
| |
− | * Jul 17, 2019 [[media:gunthroughchopperjuly17.pdf]]
| |
− | * Jun 13, 2019 [[media:190613_guntochopper.pdf]]
| |
− |
| |
− | ==Chopper Layouts==
| |
− | * chopper assembly [[media:190606_chopper_assembly_drawing.pdf]]
| |
− |
| |
− | ==Booster Layouts==
| |
− | Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
| |
− | * Sep 26, 2019 [[media:190926_boosterregion.pdf]]
| |
− | ::-QCM was .32" further downstream. so all those interfaces moved.
| |
− | ::-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
| |
− | ::-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
| |
− | ::-YAO cavity was .37" longer than the design drawing.
| |
− | * July 17, 2019 [[media:chopperthroughmodulejuly17.pdf]]
| |
− | * June 10, 2019 [[media:190610_layoutjune10.pdf]]
| |
− |
| |
− | ==Warm-RF Drawings==
| |
− | * prebuncher cavity [[media:190613_prebuncher.pdf]]
| |
− | * buncher cavity [[media:190815_CEBAF_BUNCHER.pdf]]
| |
− | * chopper RF cavity [[media:Haimson_chopper_cavities.pdf]]
| |
− |
| |
− | ==SRF Drawings==
| |
− | * drawing from Jim Henry [[media:CRM1107001-0001_-_PDF_1.pdf]]
| |