==Overall Layouts==
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
* July 19, 2019 [[media:keytotaljuly19.pdf]]
 
* July 17, 2019 [[media:keytotaljuly17.pdf]]
 
  
==Gun Layouts==
 
* Feb 26, 2020 [[media:BEAMLINELAYOUTFEB26.pdf]] edits post ME meeting, small corrections
 
:-sequence just before the gun valve goes like this if possible:  bellows + bpm/corr + valve.
 
:-remove the pink rectangular placeholders for quadrupoles
 
:-sequence after Vertical Wien:  viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
 
:-restore gap between the FG solenoids as exists in tunnel today
 
:-sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
 
:-if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
 
* Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections
 
* Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
 
* Jan 31, 2020 [[media:200203_layout.pdf]] major revision, for functionality to setup the beam line
 
* Jan 22, 2020 [[media:layout01232020.pdf]] move 2nd lens to accomodate 2-3/4" or 4-1/2" window
 
* Jan 15, 2020 [[media:200115_gun2chopper.pdf]] restore MFA0I03 and MFA0I05 to beam line
 
* Jul 17, 2019 [[media:gunthroughchopperjuly17.pdf]]
 
* Jun 13, 2019 [[media:190613_guntochopper.pdf]]
 
 
==Chopper Layouts==
 
* chopper assembly [[media:190606_chopper_assembly_drawing.pdf]]
 
 
==Booster Layouts==
 
Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster).  The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
 
* Sep 26, 2019 [[media:190926_boosterregion.pdf]]
 
::-QCM was .32" further downstream. so all those interfaces moved.
 
::-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
 
::-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
 
::-YAO cavity was .37" longer than the design drawing.
 
* July 17, 2019 [[media:chopperthroughmodulejuly17.pdf]]
 
* June 10, 2019 [[media:190610_layoutjune10.pdf]]
 
 
==Warm-RF Drawings==
 
* prebuncher cavity [[media:190613_prebuncher.pdf]]
 
* buncher cavity [[media:190815_CEBAF_BUNCHER.pdf]]
 
* chopper RF cavity [[media:Haimson_chopper_cavities.pdf]]
 
 
==SRF Drawings==
 
* drawing from Jim Henry [[media:CRM1107001-0001_-_PDF_1.pdf]]
 

Latest revision as of 14:48, 27 August 2020