Line 1: |
Line 1: |
− | == Existing April 2020 Injector Layout ==
| |
− | * Existing April 2020 injector quick reference (thanks, Daniel!) : [[media:12GeV_injector_quick_reference_rev16.pdf]]
| |
| | | |
− | ==Overall Layouts==
| |
− | Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
| |
− | * July 19, 2019 [[media:keytotaljuly19.pdf]]
| |
− | * July 17, 2019 [[media:keytotaljuly17.pdf]]
| |
− |
| |
− | ==Gun Layouts==
| |
− | * Aug 21, 2020 [[media:SONGSHEET AUGUST 21 dm comments.pdf]] Draft/preliminary songsheet
| |
− | * Apr 15, 2020 [[media:beamlinelayoutapril15.pdf]] attached is the latest layout for the beamline components
| |
− | * Apr 07, 2020 [[media:beamlinelayoutapril7.pdf]] puzzling A1/A2 layout, moving FX 2" upstream
| |
− | * Mar 26, 2020 [[media:beamlinelayoutmarch26.pdf]]
| |
− | * Mar 09, 2020 [[media:BEAMLINELAYOUTMAR09.pdf]] 90% complete layout; note bellows on A1/A2 girder
| |
− | * Feb 26, 2020 [[media:BEAMLINELAYOUTFEB26.pdf]] edits post ME meeting, small corrections
| |
− | :-sequence just before the gun valve goes like this if possible: bellows + bpm/corr + valve.
| |
− | :-remove the pink rectangular placeholders for quadrupoles
| |
− | :-sequence after Vertical Wien: viewer/cross + bpm/corr + bellows, then pipe that solenoids are attached
| |
− | :-restore gap between the FG solenoids as exists in tunnel today
| |
− | :-sequence after Horizonal Wien: viewer/cross + prebuncher + bpm/corr, then bellows
| |
− | :-if moving valve/DP can upstream a little helps w/layout that's OK, keep subsequent solenoid located as shown
| |
− | * Feb 07, 2020 [[media:beamlinelayoutfeb07.pdf]] edits post ME meeting, small corrections
| |
− | * Feb 04, 2020 [[media:BEAMLINELAYOUTFEB04.pdf]] edits post modellers meeting (add bpm/cor after Y, and swap bpm/corr by A1
| |
− | * Jan 31, 2020 [[media:200203_layout.pdf]] major revision, for functionality to setup the beam line
| |
− | * Jan 22, 2020 [[media:layout01232020.pdf]] move 2nd lens to accomodate 2-3/4" or 4-1/2" window
| |
− | * Jan 15, 2020 [[media:200115_gun2chopper.pdf]] restore MFA0I03 and MFA0I05 to beam line
| |
− | * Jul 17, 2019 [[media:gunthroughchopperjuly17.pdf]]
| |
− | * Jun 13, 2019 [[media:190613_guntochopper.pdf]]
| |
− |
| |
− | ==Chopper Layouts==
| |
− | * chopper assembly [[media:190606_chopper_assembly_drawing.pdf]]
| |
− |
| |
− | ==Booster Layouts==
| |
− | Note: At the November 12, 2019 Modeling meeting [https://wiki.jlab.org/ciswiki/index.php/November_12,_2019_-_AIPINJ_modeling_meeting], we decided to move the buncher to the midpoint position (between the centerline of the choppers and the centerline of the 2-cell in the booster). The buncher position in the July 2019 layout drawings is not the midpoint position; the buncher is shifted closer to the choppers in the July 2019 layout drawings.
| |
− | * Sep 26, 2019 [[media:190926_boosterregion.pdf]]
| |
− | ::-QCM was .32" further downstream. so all those interfaces moved.
| |
− | ::-distance between chopper cavities was 59.32", so distance from center of choppers to downstream face of chopper #2 increased from 29.65" to 29.66".
| |
− | ::-buncher, IFY0I06, MB00I06, A3, YAO cavity, A4 all moved slightly downstream.
| |
− | ::-YAO cavity was .37" longer than the design drawing.
| |
− | * July 17, 2019 [[media:chopperthroughmodulejuly17.pdf]]
| |
− | * June 10, 2019 [[media:190610_layoutjune10.pdf]]
| |
− |
| |
− | ==Warm-RF Drawings==
| |
− | * prebuncher cavity [[media:190613_prebuncher.pdf]]
| |
− | * buncher cavity [[media:190815_CEBAF_BUNCHER.pdf]]
| |
− | * chopper RF cavity [[media:Haimson_chopper_cavities.pdf]]
| |
− |
| |
− | ==SRF Drawings==
| |
− | * drawing from Jim Henry [[media:CRM1107001-0001_-_PDF_1.pdf]]
| |