Difference between revisions of "Apr 4, 2023 - CIS Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
 
(14 intermediate revisions by one other user not shown)
Line 1: Line 1:
 
== Stream of consciousness agenda... ==
 
== Stream of consciousness agenda... ==
  
* Property validations are now due April 30th
+
* Announcements...
* Safety - everyone's doing pretty good, thanks - keep it up
+
:* Property - validations are now due April 30th
* Spring/summer vacations on the horizon
+
:* Safety - everyone's doing pretty good, thanks - keep it up
 +
:* Vacations - are on the horizon - please share to my Calendar (as free)
 +
:* Lab vehicles - you can reserve for work - see Lynsie Tedrow - https://www.jlab.org/facilities/vehicles
 +
:* Sharepoint - you have access to share (backup) files with one another - [https://jeffersonlab.sharepoint.com/sites/CIS CIS Sharepoint (internal)]
 +
:* Lab IP - you can share your documented work, use Jlab funding statement - https://www.jlab.org/info_resources/publications/notice
  
* Division is asking us to finalize all work travel requests through Sep 30...  
+
* Division is asking us to finalize all work travel/meeting requests through Sep 30...  
** May - IPAC'23 (Greg/Aziz/Joe) and LCWS (Andriy/Carlos)
+
** May - IPAC'23 (Greg/Aziz/Joe) 5-13 and LCWS 15-19 (Andriy/Carlos)  
** Jun 5-9 - APS DAMOP Meeting 2023 (Riad/Matt Grau)
+
** Jun - APS DAMOP Meeting 5-9 (Riad/Matt Grau)  
 
** Jul - ?
 
** Jul - ?
 
** Aug - ?
 
** Aug - ?
Line 13: Line 17:
  
 
* Papers and proceedings...
 
* Papers and proceedings...
:: (Joe) Polarized Beam Dynamics and Instrumentation in Particle Accelerators (USPAS Summer 2021 Spin Class Lectures)
+
:* (Joe) Polarized Beam Dynamics and Instrumentation in Particle Accelerators (USPAS Summer 2021 Spin Class Lectures)
:: (Gabriel) PSTP Penning cell Wien filter
+
:* (Gabriel) PSTP Penning cell Wien filter
:: (Josh) Charge lifetime improvement of biased CEBAF photogun
+
:* (Josh) Charge lifetime improvement of biased CEBAF photogun
:: (Greg) A Compton polarimeter for SRF photoinjectors
+
:* (Greg) A Compton polarimeter for SRF photoinjectors
:: (Max) Upgraded Injector Test Facility
+
:* (Max) Upgraded Injector Test Facility
:: (Joe) Positron white paper
+
:* (Joe) Positron white paper
:: (Riad) Electron EDM
+
:* (Riad) Electron EDM
:: (Riad) Quantum computing
+
:* (Riad) Quantum computing
 +
 
 +
* CIS/IPAC'24 suggestions for invited orals...
 +
:* Particle Accelerator Spin-Transparent Storage Rings for Beyond State of the Art Science
 +
:* Making Extreme High Vacuum (XHV) commonplace in accelerators
 +
:* A new polarized electron injector at CEBAF for parity violation
 +
:* PEPPo II : a GeV positron beam experiment at CEBAF
  
 
* Proposal status...  
 
* Proposal status...  
:: (pending) - SLAC/KEK/JLAB HEP - Supports ILC PES and e+ target (Carlos, Andriy)
+
:* (pending) - SLAC/KEK/JLAB HEP - Supports ILC PES and e+ target (Carlos, Andriy)
:: (pending) - DOE ECA - PES with 1000x better vacuum (Mamun)
+
:* (pending) - DOE ECA - PES with 1000x better vacuum (Mamun)
:: (due 6/23) - LDRD PEPPo-II (Max)
+
:* (due 6/23) - LDRD PEPPo-II (Max)
:: Jun'23 - CBE (Marcy)
+
:* Jun'23 - CBE (Marcy)
:: Sep'23 - Comtra (Riad)
+
:* Sep'23 - Comtra (Riad)
:: Sep'23 - HVINS (Carlos)
+
:* Sep'23 - HVINS (Carlos)
:: Sep'23 - Robust (Joe)
+
:* Sep'23 - Robust (Joe)
  
 
* GTS
 
* GTS
** High voltage insulator/plug tests ongoing
+
:* High voltage insulator/plug tests ongoing
** TE011 cavity...?
+
:* TE011 cavity...?
** Eventually GTS could go to LERF
+
:* Eventually GTS could go to LERF
  
 
* CEBAF PES jobs...
 
* CEBAF PES jobs...
** 200 kV gun - bake out, laser alignment, HV conditioning, gun kick/spot move, picks bias voltage
+
:* 200 kV gun - bake out, laser alignment, HV conditioning, gun kick/spot move, picks bias voltage
** 200 kV Wien - 20 Amp PS, E/B spin calibration, benchmark model
+
:* Fix photocathode activation Keithley 485 Picoammeter - bad display
** Viewer/Harp/Kicker - fix short, add chopper valve/bake region, add new kicker magnet
+
:* 200 kV Wien - 20 Amp PS, E/B spin calibration, benchmark model
** Hall A laser jobs - remove ML, install repaired 250/499 board
+
:* Viewer/Harp/Kicker - fix short, add chopper valve/bake region, add new kicker magnet
** KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
+
:* Hall A laser jobs - remove ML, install repaired 250/499 board
** Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C  
+
:* KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
 +
:* Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C  
  
 
* UITF rest of this year...
 
* UITF rest of this year...
** Now operates like GTS with an OSP, Jessica safety warden and Joe POC
+
:* Now operates like GTS with an OSP, Jessica safety warden and Joe POC
** Focus will shift to using UITF to test photocathode lifetime/polarization (Greg, Aziz)
+
:* Focus will shift to using UITF to test photocathode lifetime/polarization (Greg, Aziz)
  
* Students (Sami, Sunil, Aziz, Greg, Kawser, Sohaib)
+
* Student updates
 +
** Sohaib/REU - spin tracking for CEBAF/Ce+BAF
 +
** Sami - returned to France, writing his thesis
 +
** Sunil - wants 15 Mhz bunches this summer to test his model of KL
 +
** Aziz
 +
** Greg
 +
** Kawser

Latest revision as of 14:32, 4 April 2023

Stream of consciousness agenda...

  • Announcements...
  • Division is asking us to finalize all work travel/meeting requests through Sep 30...
    • May - IPAC'23 (Greg/Aziz/Joe) 5-13 and LCWS 15-19 (Andriy/Carlos)
    • Jun - APS DAMOP Meeting 5-9 (Riad/Matt Grau)
    • Jul - ?
    • Aug - ?
    • Sep - ?
  • Papers and proceedings...
  • (Joe) Polarized Beam Dynamics and Instrumentation in Particle Accelerators (USPAS Summer 2021 Spin Class Lectures)
  • (Gabriel) PSTP Penning cell Wien filter
  • (Josh) Charge lifetime improvement of biased CEBAF photogun
  • (Greg) A Compton polarimeter for SRF photoinjectors
  • (Max) Upgraded Injector Test Facility
  • (Joe) Positron white paper
  • (Riad) Electron EDM
  • (Riad) Quantum computing
  • CIS/IPAC'24 suggestions for invited orals...
  • Particle Accelerator Spin-Transparent Storage Rings for Beyond State of the Art Science
  • Making Extreme High Vacuum (XHV) commonplace in accelerators
  • A new polarized electron injector at CEBAF for parity violation
  • PEPPo II : a GeV positron beam experiment at CEBAF
  • Proposal status...
  • (pending) - SLAC/KEK/JLAB HEP - Supports ILC PES and e+ target (Carlos, Andriy)
  • (pending) - DOE ECA - PES with 1000x better vacuum (Mamun)
  • (due 6/23) - LDRD PEPPo-II (Max)
  • Jun'23 - CBE (Marcy)
  • Sep'23 - Comtra (Riad)
  • Sep'23 - HVINS (Carlos)
  • Sep'23 - Robust (Joe)
  • GTS
  • High voltage insulator/plug tests ongoing
  • TE011 cavity...?
  • Eventually GTS could go to LERF
  • CEBAF PES jobs...
  • 200 kV gun - bake out, laser alignment, HV conditioning, gun kick/spot move, picks bias voltage
  • Fix photocathode activation Keithley 485 Picoammeter - bad display
  • 200 kV Wien - 20 Amp PS, E/B spin calibration, benchmark model
  • Viewer/Harp/Kicker - fix short, add chopper valve/bake region, add new kicker magnet
  • Hall A laser jobs - remove ML, install repaired 250/499 board
  • KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
  • Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C
  • UITF rest of this year...
  • Now operates like GTS with an OSP, Jessica safety warden and Joe POC
  • Focus will shift to using UITF to test photocathode lifetime/polarization (Greg, Aziz)
  • Student updates
    • Sohaib/REU - spin tracking for CEBAF/Ce+BAF
    • Sami - returned to France, writing his thesis
    • Sunil - wants 15 Mhz bunches this summer to test his model of KL
    • Aziz
    • Greg
    • Kawser