Difference between revisions of "Apr 4, 2023 - CIS Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 7: Line 7:
 
* Division is asking us to finalize all work travel requests through Sep 30...  
 
* Division is asking us to finalize all work travel requests through Sep 30...  
 
** May - IPAC'23 (Greg/Aziz/Joe) and LCWS (Andriy/Carlos)
 
** May - IPAC'23 (Greg/Aziz/Joe) and LCWS (Andriy/Carlos)
** Jun - Quantum Meeting (Riad)
+
** Jun 5-9 - APS DAMOP Meeting 2023 (Riad/Matt Grau)
 
** Jul - ?
 
** Jul - ?
 
** Aug - ?
 
** Aug - ?
Line 19: Line 19:
 
:: (Max) Upgraded Injector Test Facility
 
:: (Max) Upgraded Injector Test Facility
 
:: (Joe) Positron white paper
 
:: (Joe) Positron white paper
 +
:: (Riad) Electron EDM
 +
:: (Riad) Quantum computing
  
 
* Proposal status...  
 
* Proposal status...  
Line 40: Line 42:
 
** Hall A laser jobs - remove ML, install repaired 250/499 board
 
** Hall A laser jobs - remove ML, install repaired 250/499 board
 
** KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
 
** KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
** Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup with I&C  
+
** Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C  
  
 
* UITF rest of this year...
 
* UITF rest of this year...

Revision as of 05:57, 4 April 2023

Stream of consciousness agenda...

  • Property validations are now due April 30th
  • Safety - everyone's doing pretty good, thanks - keep it up
  • Spring/summer vacations on the horizon
  • Division is asking us to finalize all work travel requests through Sep 30...
    • May - IPAC'23 (Greg/Aziz/Joe) and LCWS (Andriy/Carlos)
    • Jun 5-9 - APS DAMOP Meeting 2023 (Riad/Matt Grau)
    • Jul - ?
    • Aug - ?
    • Sep - ?
  • Papers and proceedings...
(Joe) Polarized Beam Dynamics and Instrumentation in Particle Accelerators (USPAS Summer 2021 Spin Class Lectures)
(Gabriel) PSTP Penning cell Wien filter
(Josh) Charge lifetime improvement of biased CEBAF photogun
(Greg) A Compton polarimeter for SRF photoinjectors
(Max) Upgraded Injector Test Facility
(Joe) Positron white paper
(Riad) Electron EDM
(Riad) Quantum computing
  • Proposal status...
(pending) - SLAC/KEK/JLAB HEP - Supports ILC PES and e+ target (Carlos, Andriy)
(pending) - DOE ECA - PES with 1000x better vacuum (Mamun)
(due 6/23) - LDRD PEPPo-II (Max)
Jun'23 - CBE (Marcy)
Sep'23 - Comtra (Riad)
Sep'23 - HVINS (Carlos)
Sep'23 - Robust (Joe)
  • GTS
    • High voltage insulator/plug tests ongoing
    • TE011 cavity...?
    • Eventually GTS could go to LERF
  • CEBAF PES jobs...
    • 200 kV gun - bake out, laser alignment, HV conditioning, gun kick/spot move, picks bias voltage
    • 200 kV Wien - 20 Amp PS, E/B spin calibration, benchmark model
    • Viewer/Harp/Kicker - fix short, add chopper valve/bake region, add new kicker magnet
    • Hall A laser jobs - remove ML, install repaired 250/499 board
    • KL jobs - install new amplifier for KL, test 499/32 setup, measure D pulse length, and laser size
    • Moller jobs - install IA in Hall D path, measure IA rise time, review RTP setup and laser table electrical isolation with I&C
  • UITF rest of this year...
    • Now operates like GTS with an OSP, Jessica safety warden and Joe POC
    • Focus will shift to using UITF to test photocathode lifetime/polarization (Greg, Aziz)
  • Students (Sami, Sunil, Aziz, Greg, Kawser, Sohaib)