April 13, 2022 - HV chamber layout for installation in CEBAF

From Ciswikidb
Revision as of 09:21, 12 April 2022 by Chgarcia (Talk | contribs) (Created page with "==Agenda== '''Critical path action items''' # Define if anode tube will be permanently at ground, or will be electrically isolated by April 13 # Verify HV chamber dimensions...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

Critical path action items

  1. Define if anode tube will be permanently at ground, or will be electrically isolated by April 13
  2. Verify HV chamber dimensions
    • Shaun: is this needed for defining anode tube length?
    • Do you have HV chamber prints from Lekser?
    • Do you need S&A to measure HV chamber?
  3. Marcy, what are your conclusions on the HV chamber vacuum?
  4. Layout for CEBAF installation
    • The plan is to focus on layout for installing in CEBAF using DS anode flange design from Injector Phase 1 (drawing ending in 0101, see below). It is critical to define this flange by the end of April so that it can be fabricated, and vacuum degassed.
    • Anode flange prints and pictures