April 13, 2022 - HV chamber layout for installation in CEBAF

From Ciswikidb
Revision as of 09:21, 12 April 2022 by Chgarcia (talk | contribs) (Created page with "==Agenda== '''Critical path action items''' # Define if anode tube will be permanently at ground, or will be electrically isolated by April 13 # Verify HV chamber dimensions...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Agenda

Critical path action items

  1. Define if anode tube will be permanently at ground, or will be electrically isolated by April 13
  2. Verify HV chamber dimensions
    • Shaun: is this needed for defining anode tube length?
    • Do you have HV chamber prints from Lekser?
    • Do you need S&A to measure HV chamber?
  3. Marcy, what are your conclusions on the HV chamber vacuum?
  4. Layout for CEBAF installation
    • The plan is to focus on layout for installing in CEBAF using DS anode flange design from Injector Phase 1 (drawing ending in 0101, see below). It is critical to define this flange by the end of April so that it can be fabricated, and vacuum degassed.
    • Anode flange prints and pictures