Difference between revisions of "April 2, 2020 - ME/INJ/CIS/CASA"

From Ciswikidb
Jump to navigation Jump to search
Line 9: Line 9:
 
* ME providing CAD models to look at and compare w/ 2D dimensioned layout [[media:beamlinelayoutmarch26.pdf]]
 
* ME providing CAD models to look at and compare w/ 2D dimensioned layout [[media:beamlinelayoutmarch26.pdf]]
 
: Now on [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABNsJ15YGBFTQkkMenD_ommQ Link to AIPINJ OneDrive folder], then they're in the "20.03.26 Beamline Screen Shots".
 
: Now on [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABNsJ15YGBFTQkkMenD_ommQ Link to AIPINJ OneDrive folder], then they're in the "20.03.26 Beamline Screen Shots".
: MFX before A1 moves further upstream on spool
+
:: MFX before A1 moves further upstream on spool
: A2 is now a cube, instead of a cross
+
:: A2 is now a cube, instead of a cross
: harp before A2 is rotated 45 deg CW looking downstream, there is a viewer on it too
+
:: harp before A2 is rotated 45 deg CW looking downstream, there is a viewer on it too
 
* Danny working w/ MDC so their BPM shop drawings match his submitted drawing
 
* Danny working w/ MDC so their BPM shop drawings match his submitted drawing
 
* Joe finding status of BPM feed through delivery
 
* Joe finding status of BPM feed through delivery
 +
:: Requested date is 4/25
 
* ME working on finishing solenoid fixture designs
 
* ME working on finishing solenoid fixture designs
 
* Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shield.pdf]]
 
* Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shield.pdf]]
 
* ME can go ahead order spools for Sections 2 & 3
 
* ME can go ahead order spools for Sections 2 & 3
 
* Shaun add "stay clear" zone of camera to model
 
* Shaun add "stay clear" zone of camera to model
: Joe measured 4" dia x 6" length tube
+
:: Joe measured 4" dia x 6" length tube
 
* Danny check with Milhous & Jlab people for dipole design
 
* Danny check with Milhous & Jlab people for dipole design
: Yes, nice examples.  Jay OK.  Joe OK.  Req submitted & signed
+
:: Yes, nice examples.  Jay OK.  Joe OK.  Req submitted & signed
 
* Reza talk out with Curt or Rick about power needed and controls desired
 
* Reza talk out with Curt or Rick about power needed and controls desired
 
* DP can, will new $$$ NEG's fit or not
 
* DP can, will new $$$ NEG's fit or not
Line 27: Line 28:
 
* Finalize  A2 [[media:200326_aperture 2.pdf]] in layout, need to wind coils now too
 
* Finalize  A2 [[media:200326_aperture 2.pdf]] in layout, need to wind coils now too
 
* Scott figure out how to control [https://vacgen.com/linear-drive-70mm-od-75mm-z-m6-tapped-stepper-encoder], set limits, positions, use encoder w/ stac5
 
* Scott figure out how to control [https://vacgen.com/linear-drive-70mm-od-75mm-z-m6-tapped-stepper-encoder], set limits, positions, use encoder w/ stac5
: ordered stac5
+
:: ordered a stac5
 
* Tell Meyers what color to paint solenoids
 
* Tell Meyers what color to paint solenoids
: Asked for Lime
+
:: Asked for Lime
 
* Carlos/Gabriel evaluate model for smaller gap Wien filter
 
* Carlos/Gabriel evaluate model for smaller gap Wien filter
 
* Lakshmi status of PSS coil models
 
* Lakshmi status of PSS coil models
 
* Dennis turn elegant model values into expected magnet currents
 
* Dennis turn elegant model values into expected magnet currents
 
* Alicia show simulations of beams, evaluate layout for transmission and settings needed
 
* Alicia show simulations of beams, evaluate layout for transmission and settings needed

Revision as of 07:00, 2 April 2020

Meeting Info

We will meet Thursday @ 10am EDT via BlueJeans
Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334
Phone number (for audio call in): 1-888-240-2560
Meeting ID: 909497334#

Last Week's To-Do List

Now on Link to AIPINJ OneDrive folder, then they're in the "20.03.26 Beamline Screen Shots".
MFX before A1 moves further upstream on spool
A2 is now a cube, instead of a cross
harp before A2 is rotated 45 deg CW looking downstream, there is a viewer on it too
  • Danny working w/ MDC so their BPM shop drawings match his submitted drawing
  • Joe finding status of BPM feed through delivery
Requested date is 4/25
  • ME working on finishing solenoid fixture designs
  • Marcy checking on top hat configuration for Y-chamber media:200326_viewer shield.pdf
  • ME can go ahead order spools for Sections 2 & 3
  • Shaun add "stay clear" zone of camera to model
Joe measured 4" dia x 6" length tube
  • Danny check with Milhous & Jlab people for dipole design
Yes, nice examples. Jay OK. Joe OK. Req submitted & signed
  • Reza talk out with Curt or Rick about power needed and controls desired
  • DP can, will new $$$ NEG's fit or not
  • Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
  • Decide on A1 media:200326_aperture 1.pdf insert depths
  • Finalize A2 media:200326_aperture 2.pdf in layout, need to wind coils now too
  • Scott figure out how to control [1], set limits, positions, use encoder w/ stac5
ordered a stac5
  • Tell Meyers what color to paint solenoids
Asked for Lime
  • Carlos/Gabriel evaluate model for smaller gap Wien filter
  • Lakshmi status of PSS coil models
  • Dennis turn elegant model values into expected magnet currents
  • Alicia show simulations of beams, evaluate layout for transmission and settings needed