===200kV Gun===
 
===200kV Gun===
 
* Timeline/sequence update for 200kV HV chamber [[media:170421_CHG.pdf]]
 
* Timeline/sequence update for 200kV HV chamber [[media:170421_CHG.pdf]]
* Opera/Tosca 3D Model
+
* Opera/Tosca 3D Model [[media:170421_GunPics_Danny.pptx]]
  
 
===Gun2 NEG Tube===
 
===Gun2 NEG Tube===
Line 7: Line 7:
 
: [[media:M20_flange_options.pdf]] [[media:M20_BPM.pdf]]
 
: [[media:M20_flange_options.pdf]] [[media:M20_BPM.pdf]]
 
:: [[File:IMG_5188-1.JPG|100px]][[File:IMG_5189-1.JPG|100px]]
 
:: [[File:IMG_5188-1.JPG|100px]][[File:IMG_5189-1.JPG|100px]]
 +
 +
* Dependence of signal on geometry (1/r^2) results in 45% loss of M20 relative to M15
 +
: M15 radius = 1.75cm
 +
: M20 radius = 2.35cm
 +
* Dependence of spectrum on antenna length
 +
: 100keV = 0.5482
 +
: 130keV = 0.6037
 +
: 200keV = 0.6953
  
 
===Gun3 Removal===
 
===Gun3 Removal===

Latest revision as of 10:25, 21 April 2017

200kV Gun

Gun2 NEG Tube

media:M20_flange_options.pdf media:M20_BPM.pdf
IMG 5188-1.JPGIMG 5189-1.JPG
  • Dependence of signal on geometry (1/r^2) results in 45% loss of M20 relative to M15
M15 radius = 1.75cm
M20 radius = 2.35cm
  • Dependence of spectrum on antenna length
100keV = 0.5482
130keV = 0.6037
200keV = 0.6953

Gun3 Removal

Eliminating Gun Switch Software

  • Friday, April 27th Gun switch removal and testing ATLIS task

Spellman HVPS update

Radmon update

SAD Schedule