Difference between revisions of "April 21, 2022 - HV chamber layout for installation in CEBAF"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
  
 
'''Critical path action items'''
 
'''Critical path action items'''
* Anode flange designed based on Injector Phase 1 but with two HV ports
+
# Anode flange designed based on Injector Phase 1 but with two HV ports
* Need to order:
+
#* Need to order:
**2 two zero length reducer 10" to 4-1/2" flanges
+
#**2 two zero length reducer 10" to 4-1/2" flanges
**4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
+
#**4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
**4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
+
#**4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
** Ceramic beads
+
#** Ceramic beads
** Carlos to look for alternative to Cu wire with lower coefficient of expansion
+
#** Carlos to look for alternative to Cu wire with lower coefficient of expansion
  
  

Revision as of 07:36, 21 April 2022

Agenda

Critical path action items

  1. Anode flange designed based on Injector Phase 1 but with two HV ports
    • Need to order:
      • 2 two zero length reducer 10" to 4-1/2" flanges
      • 4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
      • 4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
      • Ceramic beads
      • Carlos to look for alternative to Cu wire with lower coefficient of expansion


Screen Design

Marcy dimension requests media:screens18gun.pptx