Difference between revisions of "April 21, 2022 - HV chamber layout for installation in CEBAF"

From Ciswikidb
Jump to navigation Jump to search
Line 9: Line 9:
 
#** Ceramic beads
 
#** Ceramic beads
 
#** Carlos to look for alternative to Cu wire with lower coefficient of expansion
 
#** Carlos to look for alternative to Cu wire with lower coefficient of expansion
 
+
# Screen Design
 
+
#*Marcy dimension requests [[media:screens18gun.pptx]]
'''Screen Design'''
 
 
 
Marcy dimension requests [[media:screens18gun.pptx]]
 
  
  

Revision as of 07:37, 21 April 2022

Agenda

Critical path action items

  1. Anode flange designed based on Injector Phase 1 but with two HV ports
    • Need to order:
      • 2 two zero length reducer 10" to 4-1/2" flanges
      • 4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
      • 4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
      • Ceramic beads
      • Carlos to look for alternative to Cu wire with lower coefficient of expansion
  2. Screen Design


Useful documents

Updates

TEAMS meeting link sent along with invite