Difference between revisions of "April 21, 2022 - HV chamber layout for installation in CEBAF"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
'''Critical path action items''' | '''Critical path action items''' | ||
+ | * Anode flange designed based on Injector Phase 1 but with two HV ports | ||
+ | * Need to order: | ||
+ | **2 two zero length reducer 10" to 4-1/2" flanges | ||
+ | **4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun? | ||
+ | **4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?) | ||
+ | ** Ceramic beads | ||
+ | ** Carlos to look for alternative to Cu wire with lower coefficient of expansion | ||
Revision as of 06:34, 21 April 2022
Agenda
Critical path action items
- Anode flange designed based on Injector Phase 1 but with two HV ports
- Need to order:
- 2 two zero length reducer 10" to 4-1/2" flanges
- 4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
- 4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
- Ceramic beads
- Carlos to look for alternative to Cu wire with lower coefficient of expansion
Screen Design
Marcy dimension requests media:screens18gun.pptx
Useful documents
- Anode flange prints and pictures
- Media:CIS-ASY-R30-3 schedule updateed April 12 2022.xlsx
- Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx
Updates
TEAMS meeting link sent along with invite