'''Critical path action items'''
 
'''Critical path action items'''
 +
* Anode flange designed based on Injector Phase 1 but with two HV ports
 +
* Need to order:
 +
**2 two zero length reducer 10" to 4-1/2" flanges
 +
**4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
 +
**4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
 +
** Ceramic beads
 +
** Carlos to look for alternative to Cu wire with lower coefficient of expansion
  
  

Revision as of 07:34, 21 April 2022

Agenda

Critical path action items

  • Anode flange designed based on Injector Phase 1 but with two HV ports
  • Need to order:
    • 2 two zero length reducer 10" to 4-1/2" flanges
    • 4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
    • 4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
    • Ceramic beads
    • Carlos to look for alternative to Cu wire with lower coefficient of expansion


Screen Design

Marcy dimension requests media:screens18gun.pptx


Useful documents

Updates

TEAMS meeting link sent along with invite