Difference between revisions of "April 21, 2022 - HV chamber layout for installation in CEBAF"

From Ciswikidb
Jump to navigation Jump to search
 
Line 14: Line 14:
 
#*The plan is to focus on layout for installing in CEBAF using DS anode flange design from Injector Phase 1 (drawing ending in 0101).
 
#*The plan is to focus on layout for installing in CEBAF using DS anode flange design from Injector Phase 1 (drawing ending in 0101).
 
#*It is critical to define this flange by the end of April so that it can be fabricated, and vacuum degassed.
 
#*It is critical to define this flange by the end of April so that it can be fabricated, and vacuum degassed.
#**[[Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx]]
+
#*[[Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx]]
  
 
'''Useful documents'''
 
'''Useful documents'''

Latest revision as of 07:39, 21 April 2022

Agenda

Critical path action items

  1. Anode flange designed based on Injector Phase 1 but with two HV ports
    • Need to order:
      • 2 two zero length reducer 10" to 4-1/2" flanges
      • 4 weldable 1-1/3" non-rotatable tapped flanges, or already welded to tube. Shaun?
      • 4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?)
      • Ceramic beads
      • Carlos to look for alternative to Cu wire with lower coefficient of expansion
  2. Screen Design
  3. Define layout for installation in CEBAF injector

Useful documents


Updates

TEAMS meeting link sent along with invite