Difference between revisions of "April 26, 2022 - Group meeting"
Jump to navigation
Jump to search
(Created page with "; CEBAF: * SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, heat/activate, ?) * Next run period (on-call, June through March) * Next run period physi...") |
|||
Line 1: | Line 1: | ||
; CEBAF: | ; CEBAF: | ||
* SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, heat/activate, ?) | * SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, heat/activate, ?) | ||
− | + | ||
* Next run period physics schedule: [[media:CEBAF_Schedule_2022.xlsx]] | * Next run period physics schedule: [[media:CEBAF_Schedule_2022.xlsx]] | ||
+ | * Next run period (on-call, May through August) | ||
+ | |||
* Wrap up the injector upgrade in ~1 year (200 KV gun, Phase 2 beamline) | * Wrap up the injector upgrade in ~1 year (200 KV gun, Phase 2 beamline) | ||
* Future experiments (Moller photocathodes/RTP cell/4-channel IA and KL Laser ~0.4pC@~10 MHz) | * Future experiments (Moller photocathodes/RTP cell/4-channel IA and KL Laser ~0.4pC@~10 MHz) |
Revision as of 12:53, 25 April 2022
- CEBAF
- SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, heat/activate, ?)
- Next run period physics schedule: media:CEBAF_Schedule_2022.xlsx
- Next run period (on-call, May through August)
- Wrap up the injector upgrade in ~1 year (200 KV gun, Phase 2 beamline)
- Future experiments (Moller photocathodes/RTP cell/4-channel IA and KL Laser ~0.4pC@~10 MHz)