Difference between revisions of "Aug 16, 2022 - Group meeting"

From Ciswikidb
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
* FY22 PR deadline is Friday
 
* FY22 PR deadline is Friday
 
* We'll meet next Tuesday at noon for lunch, Aziz will present
 
* We'll meet next Tuesday at noon for lunch, Aziz will present
* Phase I SBIR
+
* Phase I SBIR (LOI 8/29, Deadline 10/11) [https://www.grants.gov/web/grants/search-grants.html?utm_medium=email&utm_source=govdelivery Link is here]
 +
* HEPA install
  
 
===Next couple months===
 
===Next couple months===
Line 9: Line 10:
 
* By ready for Kicker and Compton experiments by October
 
* By ready for Kicker and Compton experiments by October
 
* Complete 200 kV HV chamber build at LERF, be ready to install UITF by November
 
* Complete 200 kV HV chamber build at LERF, be ready to install UITF by November
 +
* Build and demo a YAG/HARP cross for CEBAF
  
 
;Should
 
;Should
*  
+
* Reach next step in 500 kV insulator test
 +
* Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule
 +
* Load bulk sample to miniMott, demonstrate polarimeter functioning with any light source
 +
* Papers (magnetized beam, PV paper review, biased anode draft)
 +
* Second round of Mott measurements at UITF (forward detector, solenoid offset, remote HV PS/IHWP)
  
 
;Like
 
;Like
 +
* Student projects, how are each of them going?
 +
* PSS kicker test at UITF by end of year, depends on SSG
  
 +
===Action Items===
 +
* Riad - submit PR for Mott VME crate
 +
* Joe - tally bleed through results Spring 2022
 +
* Shukui - test 12 Mhz beam generation at UITF, Max to test w/ beam
 +
* Phil - build YAG/HARP on cross w/ top-hat and Shaun's longer nipple
 +
* Carlos - complete assembly of gun at LERF end of August
 +
* Marcy - test YAG resistance
 +
* Riad - finish PV reviews
 +
* Shukui - submit PR for beam profiler for UITF
  
 
===Updates===
 
===Updates===

Latest revision as of 13:47, 16 August 2022

General

  • FY22 PR deadline is Friday
  • We'll meet next Tuesday at noon for lunch, Aziz will present
  • Phase I SBIR (LOI 8/29, Deadline 10/11) Link is here
  • HEPA install

Next couple months

Must
  • Repair 250/500 seed board, improve board swapping, build one spare chassis
  • By ready for Kicker and Compton experiments by October
  • Complete 200 kV HV chamber build at LERF, be ready to install UITF by November
  • Build and demo a YAG/HARP cross for CEBAF
Should
  • Reach next step in 500 kV insulator test
  • Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule
  • Load bulk sample to miniMott, demonstrate polarimeter functioning with any light source
  • Papers (magnetized beam, PV paper review, biased anode draft)
  • Second round of Mott measurements at UITF (forward detector, solenoid offset, remote HV PS/IHWP)
Like
  • Student projects, how are each of them going?
  • PSS kicker test at UITF by end of year, depends on SSG

Action Items

  • Riad - submit PR for Mott VME crate
  • Joe - tally bleed through results Spring 2022
  • Shukui - test 12 Mhz beam generation at UITF, Max to test w/ beam
  • Phil - build YAG/HARP on cross w/ top-hat and Shaun's longer nipple
  • Carlos - complete assembly of gun at LERF end of August
  • Marcy - test YAG resistance
  • Riad - finish PV reviews
  • Shukui - submit PR for beam profiler for UITF

Updates

  • Joe - I'll be attending PSTP 9/25-9/30 (e+ program at Jlab) and then ERL 10/2-10/5 (e- polarized high current)
  • Phil
  • Gabriel
  • Max
  • Mamun
  • Shukui
  • Carlos
  • Riad