Difference between revisions of "Aug 16, 2022 - Group meeting"
Jump to navigation
Jump to search
(Created page with "Aug 16 ;Updates * Joe * Phil * Gabriel * Max * Mamun * Shukui * Carlos * Riad") |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | ===General=== | |
+ | * FY22 PR deadline is Friday | ||
+ | * We'll meet next Tuesday at noon for lunch, Aziz will present | ||
+ | * Phase I SBIR (LOI 8/29, Deadline 10/11) [https://www.grants.gov/web/grants/search-grants.html?utm_medium=email&utm_source=govdelivery Link is here] | ||
+ | * HEPA install | ||
− | ;Updates | + | ===Next couple months=== |
− | * Joe | + | ;Must |
+ | * Repair 250/500 seed board, improve board swapping, build one spare chassis | ||
+ | * By ready for Kicker and Compton experiments by October | ||
+ | * Complete 200 kV HV chamber build at LERF, be ready to install UITF by November | ||
+ | * Build and demo a YAG/HARP cross for CEBAF | ||
+ | |||
+ | ;Should | ||
+ | * Reach next step in 500 kV insulator test | ||
+ | * Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule | ||
+ | * Load bulk sample to miniMott, demonstrate polarimeter functioning with any light source | ||
+ | * Papers (magnetized beam, PV paper review, biased anode draft) | ||
+ | * Second round of Mott measurements at UITF (forward detector, solenoid offset, remote HV PS/IHWP) | ||
+ | |||
+ | ;Like | ||
+ | * Student projects, how are each of them going? | ||
+ | * PSS kicker test at UITF by end of year, depends on SSG | ||
+ | |||
+ | ===Action Items=== | ||
+ | * Riad - submit PR for Mott VME crate | ||
+ | * Joe - tally bleed through results Spring 2022 | ||
+ | * Shukui - test 12 Mhz beam generation at UITF, Max to test w/ beam | ||
+ | * Phil - build YAG/HARP on cross w/ top-hat and Shaun's longer nipple | ||
+ | * Carlos - complete assembly of gun at LERF end of August | ||
+ | * Marcy - test YAG resistance | ||
+ | * Riad - finish PV reviews | ||
+ | * Shukui - submit PR for beam profiler for UITF | ||
+ | |||
+ | ===Updates=== | ||
+ | * Joe - I'll be attending PSTP 9/25-9/30 (e+ program at Jlab) and then ERL 10/2-10/5 (e- polarized high current) | ||
* Phil | * Phil | ||
* Gabriel | * Gabriel |
Latest revision as of 13:47, 16 August 2022
General
- FY22 PR deadline is Friday
- We'll meet next Tuesday at noon for lunch, Aziz will present
- Phase I SBIR (LOI 8/29, Deadline 10/11) Link is here
- HEPA install
Next couple months
- Must
- Repair 250/500 seed board, improve board swapping, build one spare chassis
- By ready for Kicker and Compton experiments by October
- Complete 200 kV HV chamber build at LERF, be ready to install UITF by November
- Build and demo a YAG/HARP cross for CEBAF
- Should
- Reach next step in 500 kV insulator test
- Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule
- Load bulk sample to miniMott, demonstrate polarimeter functioning with any light source
- Papers (magnetized beam, PV paper review, biased anode draft)
- Second round of Mott measurements at UITF (forward detector, solenoid offset, remote HV PS/IHWP)
- Like
- Student projects, how are each of them going?
- PSS kicker test at UITF by end of year, depends on SSG
Action Items
- Riad - submit PR for Mott VME crate
- Joe - tally bleed through results Spring 2022
- Shukui - test 12 Mhz beam generation at UITF, Max to test w/ beam
- Phil - build YAG/HARP on cross w/ top-hat and Shaun's longer nipple
- Carlos - complete assembly of gun at LERF end of August
- Marcy - test YAG resistance
- Riad - finish PV reviews
- Shukui - submit PR for beam profiler for UITF
Updates
- Joe - I'll be attending PSTP 9/25-9/30 (e+ program at Jlab) and then ERL 10/2-10/5 (e- polarized high current)
- Phil
- Gabriel
- Max
- Mamun
- Shukui
- Carlos
- Riad