Difference between revisions of "Aug 16, 2022 - Group meeting"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* By ready for Kicker and Compton experiments by October | * By ready for Kicker and Compton experiments by October | ||
* Complete 200 kV HV chamber build at LERF, be ready to install UITF by November | * Complete 200 kV HV chamber build at LERF, be ready to install UITF by November | ||
+ | * Build and demo a YAG/HARP cross for CEBAF | ||
;Should | ;Should | ||
+ | * Load bulk sample to miniMott, demonstrate polarimeter functioning with any light source | ||
* Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule | * Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule | ||
* Papers (magnetized beam, PV paper review, biased anode draft) | * Papers (magnetized beam, PV paper review, biased anode draft) | ||
− | + | * Second round of Mott measurements at UITF (forward detector, solenoid offset, remote HV PS/IHWP) | |
+ | |||
;Like | ;Like | ||
* Student projects, how are each of them going? | * Student projects, how are each of them going? | ||
+ | * PSS kicker test at UITF by end of year, depends on SSG | ||
===Updates=== | ===Updates=== |
Revision as of 08:52, 16 August 2022
General
- FY22 PR deadline is Friday
- We'll meet next Tuesday at noon for lunch, Aziz will present
- Phase I SBIR
Next couple months
- Must
- Repair 250/500 seed board, improve board swapping, build one spare chassis
- By ready for Kicker and Compton experiments by October
- Complete 200 kV HV chamber build at LERF, be ready to install UITF by November
- Build and demo a YAG/HARP cross for CEBAF
- Should
- Load bulk sample to miniMott, demonstrate polarimeter functioning with any light source
- Develop plan for next TE011 run at GTS, w/ realistic and assigned jobs and schedule
- Papers (magnetized beam, PV paper review, biased anode draft)
- Second round of Mott measurements at UITF (forward detector, solenoid offset, remote HV PS/IHWP)
- Like
- Student projects, how are each of them going?
- PSS kicker test at UITF by end of year, depends on SSG
Updates
- Joe - I'll be attending PSTP 9/25-9/30 (e+ program at Jlab) and then ERL 10/2-10/5 (e- polarized high current)
- Phil
- Gabriel
- Max
- Mamun
- Shukui
- Carlos
- Riad